
At Oasis Pool Construction we work for you, so it’s important that each swimming pool design & build is our best work. Our swimming pool builders have had more than 20 years of experience building concrete swimming pools on the Gold Coast and surrounding areas.






We design and build fully custom concrete pools for Helensvale homes, including geometric pools, freeform pools, lap pools and pools with integrated spas. Because concrete pools are designed specifically for the property, the size, shape and layout can be adapted to suit your available backyard space and the way your family wants to use the pool.
Yes. If your Helensvale home is on a canal or waterfront block, the pool design needs to take the individual site into account. Available space, access, boundaries, existing retaining structures and engineering requirements can all influence where the pool can be positioned and how it is constructed. We assess these factors during the design stage before the final pool layout is determined.
Yes. One of the advantages of concrete is that the pool does not have to conform to a pre-manufactured shell. We can customise the dimensions and shape around the available space, existing structures and outdoor areas to make better use of a smaller or unusually shaped Helensvale backyard.
Absolutely. We look at the pool as part of the overall backyard rather than as a standalone structure. The position of the home, alfresco area, landscaping, access and available yard space can all be considered when designing a pool that works naturally with your Helensvale property.
The cost depends on the pool size and design, site access, excavation requirements, finishes, landscaping interfaces and additional features such as heating, spas or water features. Because every Oasis concrete pool is custom-designed, we assess the property and your requirements before providing an obligation-free quote rather than applying a standard price to every project.
Yes. A new swimming pool requires building approval before construction begins. In most cases this is handled through a private building certifier, with the relevant documents lodged with the City of Gold Coast. Additional requirements can apply depending on the property and proposed pool location, so these considerations should be identified early in the design process.
Concrete pool construction can generally take around one to four months, depending on the design, site conditions, approvals, weather and complexity of the project. The process includes design and approvals, excavation and construction of the concrete shell, curing, and then completing the pool interior, filtration and finishing work.